一级淫片免费视频-一级淫片在线观看-一级在线 | 欧洲-一级在线观看视频-美女一级牲交毛片视频-美女伊人网

首頁 產品展示>John Deere強鹿柴油機曲軸與曲軸瓦的安裝方法

John Deere強鹿柴油機曲軸與曲軸瓦的安裝方法

John Deere強鹿柴油機曲軸與曲軸瓦的安裝方法供應商,John Deere強鹿柴油機曲軸與曲軸瓦的安裝方法技術價格規格咨詢服務,John Deere強鹿柴油機曲軸與曲軸瓦的安裝方法零配件供應,John Deere強鹿柴油機曲軸與曲軸瓦的安裝方法售后服務中心,John Deere強鹿柴油機曲軸與曲軸瓦的安裝方法,John Deere強鹿柴油機曲軸與曲軸瓦的安裝方法詳細的技術參數,
產品咨詢

詳細描述

John Deere約翰迪爾強鹿柴油機曲軸與曲軸瓦的安裝方法

IMPORTANT: Be careful so crankshaft journals and liner walls are not damaged by connecting rod when installing piston and rod in liner.

1. Coat pistons, liners and inside of piston ring compressor with clean engine oil.

2. Carefully place JDE84 Piston Ring Compressor withpiston and rod over liner so the word “FRONT” on sideof rod and on the side of piston faces toward the frontof the engine.

NOTE: Be sure the word “FRONT” on connecting rodfaces toward the front of the engine.If arrow indicating “FRONT” is not visible on top ofpistons, install piston and rod so combustion bowlin piston is offset toward fuel injection pump sideof engine, and the long side of the connecting rodis toward camshaft side of engine.

3. With piston centered in ring compressor and ringsstaggered correctly, push piston down until top ring isinto liner.

4. Install bearing insert in connecting rod with tang (A) ingroove (B).

5. Apply clean engine oil on insert and crankshaft journal.Carefully pull connecting rod and insert againstcrankshaft journal.

A—Tang

B—Groove

NOTE: Due to the manufacturing process, thePRECISION JOINTä rod and cap both have twogrooves, while the bearing insert has a singletang. Only the one groove in the rod and cap isused for the bearing tang.

6. Install bearing insert in connecting rod cap with tang(A) in groove (B).

IMPORTANT: On PRECISION JOINTä connectingrods, make sure cap is properly alignedon rod with edges flush andinterlocking surfaces sealed tightly.

7. Apply clean engine oil to bearing insert. Install cap onconnecting rod with tangs to same side.

A—Tang

B—Groove

C—Extra Groove (Not Used)

IMPORTANT: NEVER use connecting rod cap screwsmore than once for final engineassembly. Once rod cap screws havebeen tightened to final torque-turnspecification, they must not be reusedfor another final assembly.

Cap screws for PRECISION JOINTä rodand cap are 3 mm shorter thantongue-and-groove cap screws. DO NOT

mix hardware.

Two types of connecting rods and capsmay be used within the same engine,however the correct cap screws mustbe used for each type of connectingrod.

8. Dip NEW connecting rod cap screws in clean oil andinstall.

9. Tighten cap screws alternately to initial torquespecification.

Specification

Connecting Rod Cap Screws—Initial Torque.................................................................... 58 N•m (43 lb-ft)

10. Then, torque-turn all cap screws to 90—100 degrees.(See TORQUE-TURN CONNECTING ROD CAPSCREWS next in this group.)

John Deere約翰迪爾強鹿柴油機活塞突出量的測量與標準值參數

1. Press down on top of piston to remove oil clearances before measuring piston protrusion.

NOTE: If JDG451 or KJD10123 are not available, a dial indicator with magnetic base can be used to measure piston protrusion.

2. Use JDG451 or KJD10123 Height Gauge (or use a magnetic base dial indicator) to measure piston protrusion. Place gauge on top of cylinder block so dial indicator can be set to “zero” with top of block.

3. Position gauge across piston as close to centerline of piston pin as possible. While pressing gauge downward, rotate crankshaft until piston is at TDCposition. Measure piston height at several positions around the outermost diameter of piston. Piston height must be checked at outermost diameter of piston.

4. Piston protrusion must be within specifications to prevent piston-to-exhaust valve contact.

5. Measure piston protrusion and compare to the following specifications. If protrusion does not meet specifications, check dimensions of piston, connecting rod, cylinder block, crankshaft, and bearings to determine the cause.

Piston Protrusion—Specification

4-Cyl. Standard Duty

Codes 4801, 4803, 4809.

6-Cyl. Standard Duty

Codes 4805, 4807.—Piston

Protrusion 0.08—0.31 mm  (0.003—0.012 in.)

4-Cyl. Heavy Duty

Code 4804.

6-Cyl. Heavy Duty

Codes 4808, 4810 and All

Four-Valve Head Engines.—Piston Protrusion 0.08—0.25 mm (0.003—0.010 in.)

Complete Final Assembly

1. Install oil pump outlet tube O-ring in cylinder block.Install oil pump and outlet tube. (See INSTALLENGINE OIL PUMP in Group 060.)

2. Install balancer shaft bushings (4-cylinder engines).(See REMOVE AND INSTALL BALANCER SHAFTBUSHINGS in Group 050.)

3. Install camshaft bushings. (See REMOVE ANDINSTALL CAMSHAFT BUSHINGS in Group 050.)

4. Install oil bypass valve (in front of block) and frontplate. (See INSTALL CYLINDER BLOCK FRONTPLATE in Group 050.)

5. Install balancer shafts (if equipped). (See INSTALLAND TIME BALANCER SHAFTS in Group 050.)

6. Install camshaft and timing gears. (See INSTALLCAMSHAFT in Group 050.)

7. If equipped with cartridge type oil pressurregulating valve, install valve. (See REMOVE AND

INSTALL OIL PRESSURE REGULATING VALVE inGroup 060.)

8. Install timing gear cover. (See INSTALL TIMINGGEAR COVER in Group 050.)

9. If equipped with spring, plunger and seat type oilpressure regulating valve, install valve assembly.(See REMOVE AND INSTALL OIL PRESSUREREGULATING VALVE in Group 060.)

10. Install oil pan. (See INSTALL OIL PAN in Group060.)

11. Install crankshaft pulley. (See INSTALL PULLEYOR VIBRATION DAMPER PULLEY in Group 040.)

12. Install camshaft followers. (See INSPECT,MEASURE AND ASSEMBLE CAMSHAFTFOLLOWERS in Group 050.)

13. Install cylinder head with new gasket. (SeeINSTALL CYLINDER HEAD in Group 020 for twovalve head or INSTALL CYLINDER HEAD inGroup 021 for four valve head.)

14. Fill engine with clean oil and proper coolant.

15. Perform engine break-in. (See PERFORMENGINE BREAK-IN in Group 010.)

免費熱線
400-082-9096?
整機銷售
0731-84424871? 18374999699
售后維修
0731-84424872? 15580888444
配件銷售
0731-84424873? 18274802060
手機端
微信公眾號
主站蜘蛛池模板: 午夜寂寞视频在线观看 | 三级国产| 天天干天天操天天碰 | 午夜影院网站 | 亚洲国产成人久久三区 | 日本黄色大片在线播放视频免费观看 | 日日躁夜夜躁狠狠天天 | 天天操欧美 | 性黄视频 | 久久免费看视频 | 日本免费黄视频 | 日毛片| 欧美成人猛男性色生活 | 九色视频网站 | 亚洲福利一区福利三区 | 欧美一级片在线免费观看 | 两性午夜欧美高清做性 | 欧美日韩在线一本卡 | 亚洲一区二区免费 | 亚欧成人中文字幕一区 | 日本中文字幕在线播放 | 亚洲综合亚洲综合网成人 | 全部免费特黄特色大片农村 | 欧美xxx另类 | 国产三级精品在线观看 | 额去鲁97在线观看视频 | 97色在线视频 | 午夜欧美精品久久久久久久久 | 午夜影视在线 | 中文字幕亚洲一区二区va在线 | 1024你懂的国产在线播放 | 黄色日批网站 | 在线观看免费观看 | 免费在线欧美 | 99久久免费精品视频 | 狠狠色噜噜狠狠狠狠97老肥女 | 唐人社电亚洲一区二区三区 | 天堂中文在线资源 | 天天舔 | 手机看片a永久免费看大片 手机毛片 | 深爱激情小说网 |